Rushing a reno is not always a good thing

Posted in June's Kelowna Real Estate Blog on March 8, 2010

Who says a renovation needs to be continuously worked on until it's finished? Renovating in stages is a simple concept that might work well for homeowners who can't afford to do the whole project at once.

But before you read this, you need to decide if you're the type of person who sees projects through to the end, or if you're someone who just can't stick to a plan. Because if you are someone who has good intentions but has left a bunch of half-finished renovations in your wake, this article will only add fuel to the fire of procrastination, and is not for you.

There is one other thing you need to know: Only certain kinds of projects should be attempted in stages, which are the non-essential rooms in your home. When it comes to completely renovating, lets say, the main bathroom or the kitchen or the roof, there's no room for messing around and prolonging the job. You need to get it done, efficiently, before you have damaged your house - or your relationships.

But the concept of working in multiple steps works well for finishing basements, landscaping projects, or anything you can stand to live with, unfinished, for, possibly, months on end.

If you have to go one step at a time, you and your contractor will need a plan for each stage of the project. You should also have an extended schedule you can realistically stick to, but that's also flexible. This can take some of the stress off your budget, and allow your contractor to take on other jobs in the down time.

That's one advantage of working on a project and then stepping back from it, waiting for a while and then attacking it again when you have the money. Don't forget: It's only a renovation. You don't have to run yourself into the ground, racing to get it done, or borrowing more money than you can manage to pay back comfortably.

If you are too highly motivated, you can sometimes catch 'Get-it-done-itis'. It's not a bad thing to have, unless something unexpected reveals itself: knob and tube wiring, or plumbing in need of updating, or hidden structural problems that need to be fixed. If the only plan you've got is to get the renovation done in one big step, these unexpected items can't get addressed properly. Sometimes they get left undone - which is a huge mistake, in my opinion. You're much better off stopping and re-assessing what needs to be done, even if it means delaying the finishing of your renovation for months. You never want to sacrifice safety for looks. Don't let your renovation become some kind of race, and all the focus is on the finish line, and not necessarily making it right.

If you find yourself uncovering all sorts of unexpected extra work, or you're just overwhelmed with the scope of the project, this is the time to step back and consider doing it in stages. There's no shame in taking longer to do a renovation, if the end result means a job done right.

So what do I mean by stages? Let's take the example of a laundry-room renovation. The project can be broken into manageable steps that allow for work to stop at logical places, and then easily start again at the beginning of the next step. It might take six months to get through all 10 stages, and the function of the laundry operation was never interrupted. Because the project was spread out over half a year, all the costs were also made more manageable.


Ten stages for this one project:

1. Demolition: removing old drywall on walls and ceiling and non-structural framing, and bin disposal

2. Insulation and reframing: installing Rigid foam insulation and new stud walls

3. Wiring and plumbing updating: done by licensed trades, with all necessary permits. Repositioning copper pipes and electrical outlets

4. Drywall and mudding, including building bulkheads around HVAC ductwork

5. Priming and painting walls

6. Installing vinyl flooring

7. Installing new appliances, utility tub and faucets

8. Installing drop Ceiling and light Fixtures

9. Painting and installing baseboards and trim

10. Installing laundry cupboards


And having a plan that's flexible can allow for unexpected delays. In the case of this project, if there are several unexpected steps, and corresponding costs, like if the existing plumbing and wiring need to be updated, the licensed trades are able to do this work in just a day, without interrupting the laundry. But raising the funds to cover the extra costs might add several weeks to the planned finished date.

The delivery of the new appliances has to be co-ordinated with the date for after the installation of the new flooring. This is important, so the new laundry machines won't require moving after they're put in place. Whatever the project, try to make sure the stages don't overlap, and make more work for your contractor by repeating steps. You and your contractor have to be in agreement and work well together to tackle a project in stages.

The other big part of this approach to take into account is the other people who live in the house. Can they live in a construction zone for a long period of time? Some people find it stressful living in a work-in-progress zone and, frankly, I rarely recommend it. So, before undertaking a renovation in stages, make sure everyone in the household is on board with the plan.

(prepared by Mike Holmes/National Post/Dec 30, 2009)


Contact June   Over 22 years of experience on your side.

 Kelowna Realtor - June Conway

Recently Featured Blog Posts:
February 3, 2012
January house shoppers - Kelowna area home sales activity is typical for the first month of the year~ a lower number of sales likely improving in...

January 27, 2012
Typical regional real estate sales patterns in 2012 - The British Columbia Real Estate Association (BCREA) just released its 2012...

January 25, 2012
What's moving our local real estate market? - Up to 40% of Kelowna area sales come from non-local buyers. In the past 16 months Okanagan...

Browse June's Blog Archive:
May 2011 to Sep 2011
Aug 2010 to May 2011
Jul 2010 to Aug 2010
Jun 2010 to Jul 2010
May 2010 to Jun 2010
Apr 2010 to May 2010
Mar 2010 to Apr 2010
Mar 2010 to Mar 2010
Feb 2010 to Feb 2010
Jan 2010 to Feb 2010
Jan 2010 to Jan 2010
Dec 2009 to Jan 2010
Nov 2009 to Dec 2009
Sep 2009 to Nov 2009
Jul 2009 to Sep 2009
May 2009 to Jul 2009
Apr 2009 to May 2009
Mar 2009 to Apr 2009
Jan 2009 to Mar 2009
Nov 2008 to Jan 2009
Sep 2008 to Nov 2008
Jul 2008 to Sep 2008
May 2008 to Jul 2008
Apr 2008 to May 2008
Mar 2008 to Apr 2008
Feb 2008 to Mar 2008
Dec 2007 to Feb 2008
Oct 2007 to Dec 2007
Aug 2007 to Oct 2007
May 2007 to Aug 2007
Feb 2007 to May 2007
Dec 2006 to Feb 2007
Oct 2006 to Dec 2006
Jun 2006 to Oct 2006
Mar 2006 to Jun 2006
Jan 2006 to Mar 2006
Jan 2003 to Jan 2006


 June's Kelowna Blog Feed
Share this page:
Share/Bookmark Share/Bookmark Share/Bookmark Share/Bookmark


RE/MAX Kelowna BC

JUNE CONWAY personal real estate corporation
100-1553 Harvey Ave, Kelowna, BC V1Y 6G1
Office: 250.717.5000 Fax: 250.861.8462
June's Toll Free: 1.888.657.7123

www.KelownaRealEstateMarket.com

Each Office independently owned and operated.

© 2012 June Conway. All rights reserved. Information is deemed reliable but is not guaranteed.

Website by 12h.ca